• How do you disable FarmWatch Pro SMS notifications?

    FarmWatch Pro sends SMS notifications by default when an alarm is reported. It is possible to turn them off in 3 different ways. Disabling notifications in the Fetura CLOUD application. Browser version Enter your farm and go to settings. Then go to FarmWatch PRO settings. Go to FarmWatch PRO management….

  • How to assign feed to a silo?

    After logging in , go to the SILOS tab . Select the silos you want to assign feeds to by clicking on them and select SELECT FEED. Then select the feed you want to assign to the silo [1] and click the save button [2].

  • How to add a feed?

    After logging in, go to the Settings tab. Then go to the Feeding tab. Find the List of forages tab and navigate to it. Click the highlighted button to add a new feed. Enter what name the feed should be named [1], what color it should be marked with [2…

  • How to configure IPSUM?

    Navigating to the configurator To configure IPSUM, go to the Settings tab. Then go to the Feeding tab. Find the IPSUM dispenser settings tab and enter it. A list of IPSUMs added to the farm will appear, select the ones you want to configure. Configuration Mode of operation On this…

  • How to edit the settlement on IPSUM?

    After logging in, go to the IPSUM tab. Select the IPSUM on which you want to edit the settlement [1], click the blue button with three dots, and click EDIT settlement [2]. Enter when the settlement started [1], when it ends [2] and the average age of the animals during…

  • How to add a settlement on IPSUM?

    After logging in, go to the IPSUM tab. Click the CREATE SETTLEMENT button on the IPSUM tile where you want to add a settlement. Enter when the settlement started [1], how many days it will last [2] and the average age of the animals during it [3]. After entering the…

  • How to assign IPSUM to a chamber?

    To assign IPSUM to a chamber, go to the Settings tab. Then go to the Devices tab. Then go to the Assign devices to places tab. If you have not yet created chambers use the article below. From the available chambers, select the one to which you want to assign…

  • Nutri SORT – wiring and commissioning

    Schematic of the board 1. 28 VDC input – main power supply of the Sorting Station (from left: GND, +28 VDC) 2. 24 VDC valve island power supply output (from left: +24 VDC, GND) 3. Strain gauge 1 output (from left: A+, A-, E-, E+) 4. Strain gauge output 2…